Consulting | Operational Diagnosis at the Morro do Ferro Wastewater Treatment Plant (SAAE Oliveira - MG)

Consulting services for operational diagnosis in municipal wastewater treatment plants.

Consulting services for operational diagnosis in municipal wastewater treatment plants.

In this project, the company Wetlands Construídos was contracted by SAAE of Oliveira-MG to carry out an operational diagnosis of the wastewater treatment plant (WWTP) in the Morro do Ferro district. The WWTP consists of prefabricated modular reactors employing the UASB + Anaerobic Biological Filter arrangement.

The services consisted of investigations of the implemented technological arrangement, seeking potential construction and operational problems that led to the low efficiency of the WWTP. All sizing parameters were verified based on real operational conditions. Despite being a process that is inherently inefficient, deviations were identified that further reduced the efficiency of the WWTP. Among these, the lack of a sludge disposal structure, the absence of biogas combustion structures, poor quality in the manufacture of the three-phase separators, among others, were observed.

The actions recommended by the Wetlands Construídos team were implemented by SAAE of Oliveira, which allowed for the improvement of the efficiency of the Morro do Ferro WWTP.

Technical indicators

500

m³/day

1000

Area (m²)

2020

Start of operation / project date

Galeria de fotos

MARCA_WETLANDS-H-NEGATIVO_MONOCROMIA.png

Regenerate water and soil.

Reduce our impact.

Being in tune with nature.

  • Instagram - White Circle
  • LinkedIn - Círculo Branco
  • Facebook - Círculo Branco
  • YouTube - Círculo Branco

+55 31 3401-1155 / 9 7169-4060

wetlands@wetlands.com.br

Belo Horizonte Technology Park

Professor José Vieira de Mendonça Street, 770, Room S51 | BHTEC Building | Engenho Nogueira

Belo Horizonte - MG - Postal Code 31310-260

Inscreva-se para receber notícias!

Obrigado por estar conosco!

bottom of page